These windmills have now been installed on a balcony, and can be activated via the giant hairdryer.
When the receiver receives a signal from the hairdryer, the corresponding stepper motor is ramped up to speed.
MDF jigs were used to position the steel components before welding.
A jig with rollers was constructed to fold the pinwheel signs.
A stepper motor was also retrofitted to an existing model ferris wheel.
NEMA24 motors with 10:1 ratio planetary gearboxes were used on each windmill.
Installed on the balcony at Wake the Tiger.